Foundation Stone in Idlib
Officials laid the foundation stone on 28 November 2026 for the first phase of an eastern expansion of the Bab al-Hawa industrial city in Idlib province. The ceremony was attended by the minister of industry and internal trade, Basel Abdulhanan, and the Idlib governor, Mohammed Abdulrahman.
Subscriptions for the new industrial plots opened the same day, allowing investors to apply for sites inside the enlarged zone.
Scale of the Expansion
The new section covers 363,894 square meters, roughly 37 hectares. Of that, 240,000 square meters are set aside for industrial plots, 67,500 for roads, 50,000 for green space, and 6,394 for administrative buildings.
The expansion adds more than 122 plots ranging from 1,000 to 3,500 square meters each, served by electricity, water, telecommunications, sanitation, industrial drainage, and firefighting systems.
Turkish Developer
A Turkish company signed the contract to develop and build the expansion, with the agreement concluded at the Damascus International Fair. A company representative said preparations had taken more than a year because of the site's rocky terrain.
Jobs and Returning Residents
Construction currently supports more than 500 jobs, a figure officials expect to reach about 5,000 once factories enter production. The governor said the projects were meant to create work that would help residents of displacement camps return home.
The existing industrial city already contains about 200 facilities, of which more than 150 are in production and 50 are under construction.
Timeline and Next Phases
Roads and infrastructure for the expansion are expected to be finished within a year, with some facilities potentially starting production in the same period. Authorities also plan a separate industrial city at Ma'arat al-Nu'man, to be built in two phases of 100 and 200 hectares for light industries.
